On the eve of the New Year, we show the current dynamics construction of the residential complex "Svetliy Mir “V stremlenii k svetu...". Read the report and see the photo!
Buildings 7 and 8
- Installation of tiles in the halls, insulation and a subsystem of the suspended ventilated facade for the upper floors.
- Laying tiles in the bathrooms of apartments.
- Installation of electrical panels.
- Installation of cold and hot water risers up to the 25th floor.
- Final work on the installation of low-current systems.
- Installation of sewers and risers for cold and hot water supply in sections No. 1 and No. 2 from the 16th to the 22nd floor.
Building 9
- Installation of elevators, insulation, guides for installing a ventilated curtain facade from the 15th to the 25th floor and low-current systems from the 2nd to the 25th floor.
- Installation of sewerage systems and risers for cold and hot water supply in section No. 1, in section No. 2, the work was completed up to the 15th floor.
- Elevators are being launched.
DDOU
— Masonry of the 3rd floor.
- Laying of engineering networks: storm sewers, heating networks, water supply and electrical systems.