The fresh construction dynamics of the RC “Svetliy mir “Skazochnyy les...” is ready! See the photos and take a moment to appreciate how bright and sunny the facades of the residential complex look against the background of nature that has not yet woken up.
Buildings No. 1 and 2
— An individual heat point has been launched.
— Plastering of balconies, roof superstructures, descents to the basement, pits.
— Installation of a hinged ventilated facade and stained-glass windows.
— Floor screed in flats and common facilities.
— Finishing works.
— Assembly of the main switchboards.
— Hydraulic tests of the heating system.
Buildings No. 3 and 4
— Assembly of the main switchboards.
— Finishing works.
— Installation of metal doors.
— Floor screed.
— Decorative plaster.
— Installation of the ventilated facade composite.
— Installation of water supply and sewerage, hydraulic testing of the heating system.
Pre-school education facilities
— Installation of stained-glass windows, metal fences and roof structures, hinged ventilated facade.