Headline: RC “Svetliy mir “Stantsiya “L”...” in February

02
march 2023

“Svetliy mir “Stantsiya “L”…”

We have prepared for you a fresh report on the construction dynamics of the RC “Svetliy mir “Stantsiya “L”...”.

Building No. 3

— Masonry of internal and external walls: internal masonry up to the 13th floor in sections 1-3, external masonry up to the 19th floor in section 1.
— Installation of entrance doors and door blocks in common facilities and on transition balconies.
— Insulation of balconies.
— Installation of windows in sections 1-4 up to the 15th floor.
— Laying of the roof of the housing.
— Floor screed.
— Installation of metal fences, roof structures, decking in section 4 and guides in elevator shafts of sections 2 and 3.
— Preparatory work for the installation of internal heating networks, water supply and sewerage: laying of routes, risers, installation of technical openings.

Building No. 11

—Laying of external and internal masonry, as well as the roof of the housing.
— Installation of windows and balcony doors on floors 15-25.
— Insulation of balconies.
— Installation of entrance doors and door blocks on the transition balcony.
— Installation of ventilated facade brackets.
— Beginning of work on screed floors.
— Installation of guides in elevator shafts of sections 1 and 6.
— Metal fences and roof structures.
— Installation of internal heating, water supply and sewerage networks: laying of routes, risers, installation of technical openings.