We share the dynamics of the construction of the residential complex "Svetly Mir "Skazochnyy les...".
Buildings 1 and 2
— Final works on the roof, installation of the ventilated curtain facade, stained glass windows and decorative plaster of balconies.
- Floor screed in apartments and MOPS from the 20th to the 25th floor.
- Elevator launches.
- Finishing works: plastering in apartments and MOPS, laying tiles in bathrooms.
- Installation of heating systems, cold and hot water pipes in the bathrooms of apartments.
- Plastering and putty works in MOPS.
Buildings 3 and 4
— Final works on individual heating points.
- Floor screed in apartments and MOPS.
- Installation of windows, insulation and guides for the subsequent installation of a hinged ventilated facade.
- Laying of heating and water mains in basements, heating risers on floors.
- Plastering and putty works in public areas and apartments.
DDOU
-Installation of stained glass windows, suspended ventilated facade and engineering systems: storm drains, heating, cold and hot water supply, as well as lighting in the basement.