Here is some new information about the construction progress of the RC “Svetliy mir ”BioPolis…”. Read the report and see the photo!
Buildings No. 1-3
— Work on internal power grids.
— Finishing.
— Laying of the roof.
— Assembly of water supply and heating systems.
— Floor screed.
Buildings No. 4-6
— Facade work and installation of stained-glass windows.
— Installation of internal power grids.
— Installation of windows.
— Finishing.
— Assembly of water supply and heating systems.
— Laying of the roof on the buildings.