We are in a hurry to tell you about the construction of the “Svetliy Mir “Stantsiya “L”...”residential complex. Read the construction report and see photos!

Building 11

-Surface grinding and concreting of roof access structures.
- Installation of masonry of internal and external walls up to the 24th floor.
- Floor screed and installation of window blocks up to the 13th floor.
- Closing of the heat circuit and installation of utility networks in each section.

Building 3

-Surface grinding and masonry construction of internal and external walls from the 2nd to the 13th floors.
- Installation of window and door blocks, ventilation units from the 2nd to the 16th floor, as well as staircases from the 2nd to the 10th floor and utility networks in all sections.
- Closing the heat loop in each section.